From Bid to Installation — A Process You Can Count On

At Andaaz Manufacturing, we believe a strong process builds strong partnerships. We keep every phase transparent — from estimating and engineering through production, logistics, and installation. No surprises. No guesswork. Just clear timelines, consistent updates, and dependable results.

Every project begins with communication and alignment. From your first RFQ to the final install, we work as an extension of your team to protect design intent, manage cost, and deliver on schedule.

1

Bid &
Estimation

1–2 weeks

  • Transparent project quote
  • No minimum order quantities
  • Budget guidance + value engineering

2

Kickoff &
Engineering

7–10 business days 

  • Dedicated project manager assigned

  • Kickoff call with full scope review

  • Shop drawings + approvals begin

3

Custom
Finish Samples

10–20 business days 

  • Digital + physical finish samples

  • Custom stain, metal, veneer and stone matches

  • Client approval before production

4

Model Room
Prototype

3–4 weeks

  • Full model room build

  • Complimentary installation support

5

Full Production
& QC

4–6 weeks

  • Production begins after sign-off
  • Weekly progress reports + photos
  • On-site quality control inspections

6

Shipping &
Installation

Ocean 4–6 weeks | Air 10 days

  • Global logistics + freight management

  • Delivery to warehouse or job site

  • Installation guidance + support

We provide transparent, shipping-inclusive quotes with no minimum order quantities. Our estimating team can also support value engineering options and early budget pricing to help you plan with confidence.

Typical timeline: 1–2 weeks

After a purchase order is issued, your dedicated project manager is assigned and a kickoff meeting is scheduled to review scope, milestones, approvals, and logistics. Our engineering team begins shop drawings within 7–10 business days, detailing construction methods, materials, and hardware for build accuracy.

We provide custom finish matches based on your material direction, including stains, laminates, metals, quartz, and fabrics.

  • Digital approvals: 10–15 business days
  • Physical samples: 15–20 business days

Before full production, we build a model room and provide complimentary installation support so your team can review:

  • Design accuracy
  • Proportion and scale
  • Joinery and construction methods
  • Finishes and materials

This step ensures full alignment before production and helps prevent costly revisions during installation.

Once approved, model room production takes 3–4 weeks, followed by 4–6 weeks for full production depending on scope. Our on-site QC managers inspect each stage of production — from raw materials through assembly — with weekly progress reports and photos shared with your team.

We coordinate both ocean freight (4–6 weeks) and air freight (10 days) based on your project schedule. Whenever possible, we ship fully assembled pieces to reduce install time and risk. Our team also provides complimentary on-site model room installation support to guide your team through a smooth rollout.