From Bid to Installation — A Process You Can Count On
At Andaaz Manufacturing, we believe a strong process builds strong partnerships. We keep every phase transparent — from estimating and engineering through production, logistics, and installation. No surprises. No guesswork. Just clear timelines, consistent updates, and dependable results.
Every project begins with communication and alignment. From your first RFQ to the final install, we work as an extension of your team to protect design intent, manage cost, and deliver on schedule.
1
Bid &
Estimation
1–2 weeks
- Transparent project quote
- No minimum order quantities
- Budget guidance + value engineering
2
Kickoff &
Engineering
7–10 business days
Dedicated project manager assigned
Kickoff call with full scope review
Shop drawings + approvals begin
3
Custom
Finish Samples
10–20 business days
Digital + physical finish samples
Custom stain, metal, veneer and stone matches
Client approval before production
4
Model Room
Prototype
3–4 weeks
Full model room build
Complimentary installation support
5
Full Production
& QC
4–6 weeks
- Production begins after sign-off
- Weekly progress reports + photos
- On-site quality control inspections
6
Shipping &
Installation
Ocean 4–6 weeks | Air 10 days
Global logistics + freight management
Delivery to warehouse or job site
Installation guidance + support
Step 1 — Bidding & Estimation
We provide transparent, shipping-inclusive quotes with no minimum order quantities. Our estimating team can also support value engineering options and early budget pricing to help you plan with confidence.
Typical timeline: 1–2 weeks
Step 2 — Kickoff & Engineering
After a purchase order is issued, your dedicated project manager is assigned and a kickoff meeting is scheduled to review scope, milestones, approvals, and logistics. Our engineering team begins shop drawings within 7–10 business days, detailing construction methods, materials, and hardware for build accuracy.
Step 3 — Finish Samples
We provide custom finish matches based on your material direction, including stains, laminates, metals, quartz, and fabrics.
- Digital approvals: 10–15 business days
- Physical samples: 15–20 business days
Step 4 — Model Room & Prototype
Before full production, we build a model room and provide complimentary installation support so your team can review:
- Design accuracy
- Proportion and scale
- Joinery and construction methods
- Finishes and materials
This step ensures full alignment before production and helps prevent costly revisions during installation.
Step 5 — Full Production & Quality Control
Once approved, model room production takes 3–4 weeks, followed by 4–6 weeks for full production depending on scope. Our on-site QC managers inspect each stage of production — from raw materials through assembly — with weekly progress reports and photos shared with your team.
Step 6 — Shipping & Installation
We coordinate both ocean freight (4–6 weeks) and air freight (10 days) based on your project schedule. Whenever possible, we ship fully assembled pieces to reduce install time and risk. Our team also provides complimentary on-site model room installation support to guide your team through a smooth rollout.